We installed the full electrical package in a new prep room and two new laboratories, complete with six fume cupboards. Due to the expanse of the schools requirements, the dining hall and kitchen prep area were stripped out and converted into two laboratories, with the labs prep room and the adjoining corridor.
- New lighting design
- Fire alarm
- Ventilation
- Gas proving units
- Interactive TV system
See adjoining photographs showing the transition before, during and the finished project.